Thermoelectric 3 # boiler project building steadily
    on 30th October,Nantong Lianfa thermoelectricity Co., LTD, the phase iii extension engineering of boiler project has the boiler hydrostatic test conditions, and accept the inspedtion by the expert cames from the province boilers and pressure vessel inspection center. This marks the thermoelectric companymade a solid step to the corporation’s strategic planning, vision target.
 Suggestion   Copyright   Transportation Guide   Site Map   About Lianfa   Contact Us     JiangSu ICP No.09017724
Copyright @ 2010 lianfa.cn All Rights Reserved
Jiangsu Lianfa Textile Co.,Ltd.